-
Explosion-proof Certificates for MANET Radios
LinkAV's MANET radios have obtained the explosion-proof certificate issued by CNEX and CCCMT.
2024-09-25 Admin
-
Tri-band MESH Radio Tunnel Test Report
Tri-band MESH Radio Tunnel Test ReportAba Prefecture Balang Mountain Doshi Mountain TrackModel: MANET301M-3 Test Date: August 18, 20241. OverviewThe test site is located at the construction site of th
2024-08-23 Admin
-
LinkAV Renewed Its ISO 9001:2015 Certification
LinkAV has renewed its ISO 9001:2015 certification, which is valid until September 6, 2027.
2024-08-16 Admin
-
LinkAV MANET Radio 40NM (74KM) Distance Test Report
LinkAV MANET RadioWeihai Maritime Safety Administration 40NM (74KM) Distance Test Report.
2024-06-30 Admin